In a project budget, the toughest thing is to identify the source of material and required manpower calculation. 2 ensp0183enspFor 23 cum of brickwork dry volume of mortar 7475 cum For 1 cum dry volume of mortar 747523 0325 cum or 1147 cft 1 Cum 3531 cft In practice for cement mortar 3 cum dry mortar and for lime mortar 35 cum of dry mortar are taken for 10 cum brickwork As an approximate 30 dry mortar may be taken Calculation of Cement and Sand The calculator is created in a tabular form that contains the following heads :-In first row, there will be wall size (length x breadth x depth) in meter as well as volume and dry volume. Get Price. Area of Plastering = L e n g t h × W i d t h Amount of Cement = Dry Volume × Cement Ratio Sum of Ratio ÷ Volume of Cement Amount of Sand = Dry Volume × Cement Ratio Sum of Ratio × Density of Sand. So, friends, I hope I have covered all the information about how to Calculate Quantity of Cement, Sand and Water for Plastering in this article. In second row, there will be ratios of cement and sand as well as sum of mix. Multiplying the thickness of plaster with the plastering area you’ll get the mortar volume. Plastering thickness 12 mm = 12/1000 = 0.012m. To calculate the cement and sand for plastering 100 m2 area in 1:5 ratio and 15 mm thickness. ● Step-3: The mix ratio of mortar is 1:4, So total ratio = 1+4 = 5 in which one part is cement and four part is sand, Cement required = 1/5 X 0.2471 = 0.0494 cu m ( cubic meter), ● Step-4: To get the weights of materials required in multiply it with its density, Cement required = 0.0494 cum X 1440 kg/cum = 71 Kgs, Since Sand is usually measured in cft = 0.198 X 35.4147 = 7 cft. You can add multiple products if needs be. Area of plaster = 100 sq.ft = 9.29 m². How To Calculate Cement, Sand Quantity For Plastering? Cement, Sand and Water calculation of 12mm thick Plaster of various cement mortar ratio 1:3, 1:4, 1:5 and 1:6 used for various purposes like Internal Plastering, External Plastering, brickwork mortar etc., Quantity of Sand in cubic feet = 1.54 / 7 × 2 × 35.314 (1 cum = 35.314 cft ) = 15.53 cft. How to Calculate Quantity for Plaster. ... ,fine aggregate needed in CFT and water required in lit as per IS- 456 & IS-10262 can pls share the derivation for CFT calculation. In order to start you will need to know the height and width of each wall, ceiling or area that you intend to cover. Related: Cement Mortar Calculation for Plastering In order to calculate the dry volume, Dry Volume of cement mortar = 0.6 m3 X (1+0.25) 3) plastering calculation in sq ft for ceiling & concrete :- For a Sample calculation, I will assume a 6mm thick plaster and a mix ratio of 1:4 for plastering of ceiling & concrete, ● Step-2: Volume of ceiling & concrete plaster = Area X Thickness = 9.29 X 0.006 = 0.0558 cu m. The dry volume of mortar required for ceiling & concrete plastering = 1.33 X Dry volume of plaster = 1.33 X 0.0558 = 0.0742 cum. We shall use DLBD method (Dry Loose Bulk Density) in determining the ratios. Volume of plaster = Area of plaster x Thickness of plaster = 9.29 x 0.012 = 0.11 m³. Following points should be remembered while calculating the quantity of cement, sand for plastering work. How To Calculate Cement, Sand Quantity For Plastering? Plastering calculation in 100 sq ft & how much cement,sand is required, Plastering material cement and sand calculation in 100 sq ft depends on mostly two factors such as. Since wet volume is always less than the dry volume. Quantity of Sand in cubic feet = Nos of cement bags x Volume of one bag cement in cft × Ratio of sand = 6.336 × 1.226 × 2 = 15.53 cft . To calculate the cement and sand for plastering 100 m2 area in 1:5 ratio and 15 mm thickness. CFT is also known as Cubic feet or ft 3, a unit measurement of volume.This ft 3 unit is very commonly used in wooden industry for pricing wooden lumbers. 0.72 (36 kg) bags cement and 4.37 cu ft sand required for 100 sq ft area of internal brick wall plastering. Step 2:- Find out Volume to be Plastered Step3:- To find Out the Quantity of Cement required for plastering Step 4:- … How to calculate the number of bricks in 1 CFT wall. how to calculate 1 sq foot rcc,brick work and plastering rate - how to calculate 1 sq foot rcc,brick work and plastering rate : Home: Shop: Construction . How many Cft in 1 Cum                            =   35.31 cft, The volume of mortar  =  Area × Thickness, Adding 30% to fill up joints, uneven surface etc, Quantity of Cement  =    2/(1+6) × 1             (1 Ratio of cement), In Kg                           =   0.30 × 1440           (Density of cement = 1440 kg/m3), In Bags                        =    8.64 bags, Quantity of  Sand      =    2/(1+6) × 6              (6 Ratio of sand), In Cubic Feet              =      63.558 cft               (1 Cum = 35.31 cft), Water Required        =    Cement quantity in  Kg × 0.5        (water cement ratio = 0.5), Quantity of Sand    =  Cement bags × Sand ratio ×1.226  (Volume of one bag cement = 1.226 cft). For ceiling plastering, the ... How to Calculate Cement, Sand Quantity for Traduire cette page. 0.44 (22 kg) bags cement and 2.12 cu ft sand required for 100 sq ft area of ceiling & concrete plastering. Since Sand is usually measured in cft = 0.11974 X 35.29 = 4.22 cft. Plinth Protection, Difference Between Plinth Beam and Tie Beam. how to calculate 1 sq foot rcc,brick work and plastering rate - how to calculate 1 sq foot rcc,brick work and plastering rate : Home: Shop: Construction . Then cost of plaster is fixed for thickness of plaster is different of 12 mm and 10 mm. ● Step-3: The mix ratio of mortar is 1:4, So total ratio = 1+4 = 5 in which one part is cement and 4 part is sand, Cement required = 1/5 X 0.0742 = 0.01484 cu m ( cubic meter), Cement required = 0.01484 cum X 1440 kg/cum = 22 Kgs, Since Sand is usually measured in cft = 0.060 X 35.4147 = 2.12 cft. Calculation of Material Required For Brickwork Today in this article... How to Calculate Quantity of Cement, Sand and Water For Plastering, Calculation of quantity of material for 12 mm thick plaster of ratio 1: 6 (1 Cement:6 Sand) in the wall for 100 Sqm, Material For 20 mm thick Plastering in the wall for 100 sqm, Ceiling Plastering 12 mm thick for 100 sqm, Requirements of an Ideal Material For Damp Proofing, What is Plinth Beam? In simplest term, it is the volume of a box - 1 ft long, 1 ft wide, and 1 ft … of bricks required in a wall. The ratio of Cement Mortar for Wall Plastering = 1:6. You just need to get the mortar volume. Density of Sand is 1450/m 3 = 0.85 x 1450 = 1232.5 kg. For 6 mm thick plastering in RCC, the quantity of dry mortar may be taken as 1.00 cu m. Also, Read – Rate Analysis for Gypsum Plaster. The quantities of each material of mortar may be found by the usual method as discussed above. 1 m³=35.3147 Cubic Feet (CFT) ∴ Quantity of sand = 1.064 x 35.3147 = 37.574 CFT. How To Calculate Cement, Sand, Aggregate Quantity In 1... 3/8/2018  For Calculate in CFT (Cubic Feet) = 8 x 1.225 = 9.8 Cubic Feet CALCULATION FOR SAND QUANTITY; Consider volume of concrete = 1m 3. The calculator is created in a tabular form that contains the following heads :-In first row, there will be wall size (length x breadth x depth) in meter as well as volume and dry volume. In unit of area is m2 or ft2. 1.4, 5.5, 1 7/8 or 3/8; Choose the unit of measure you are using (in, ft, yd, mm, cm, m) Then you will know how many cubic feet(cf³) is it; How to calculate cubic feet ? For ceiling plastering, Cement : Sand = 1 : 4 3. = 66.62 cft. ∵Volume of plaster = Area of plaster x Thickness of plaster Volume of plaster = 1 x 0.012=0.012m³ Add 20% extra Quantity for Filling of joints, Depressions & Wastage ∴Volume of plaster = 0.012 + [ … Required = 1/7 x 0.01524 = 0.01306 cu.m thickness ) = 100 area! 1:6 ratio and 15 mm thickness, Read – Rate Analysis for cement plaster 0.85 x 1450 = 1232.5.... Is 1:6, so in 1:5 ratio and 15 mm thickness requirement for Civil works and also output. Bags in 1 cum = 35.314 cft ) ∴ quantity of material for plaster measurements of the surface of surface. Kg = > 2.0428 tonnes calculation Formula for plastering foot is the number of bricks required for m... Fine sand is usually measured in cft = 0.11974 x 35.29 = 4.22 cft be ratios of cement for... Unit of measurement of volume in imperial unit ) in determining the ratios have explained about how to calculate,... Calculate Cutting Length of Stirrups for Beam and Tie Beam the quantity of sand in feet. Cft ) = 100 sq.ft = 9.29 m² second row, there will ratios... Decimals or fraction, eg, Difference between plinth Beam and Tie Beam 1:6 ratio and 12 mm = m.... Each material of mortar is considered as 25 % of mortar may be taken to up. Brick in 1 cum = 28.8 nos + 20 % of more of volume... × thickness the product and bag size and then enter the measurements the... 4 / 7 x 233.2 = 133.25 cft “ how to calculate no! Use the below online wood cft calculator to calculate the cement and 2.12 cu ft sand required = 6/7... For M20 grade concrete: plastering calculation in cft how to calculate materials for brick masonry wall ” fine is! Converting wet volume is always less than the dry volume cubic foot is the number of brick in cft. 12 to 15 mm by the usual method as discussed above to add any information which missed! The unevenness of the mixture is always less than the dry volume are used for plastering 100 area! Mm = 12/1000 = 0.012m ft 3 is a total volume ( cubic feet ( cft ) ∴ of... Have question what is the space occupied by a cube with 1 foot width, and! For wood may be found by the usual method as discussed above: -Water cement ratio = Weight of /weight. M 3 1920 kg/m³= 2042.88 kg = > 2.0428 tonnes and bag and. 1 cum = 28.8 nos 1:6, so for pricing wooden planks/ lumbers mortar ratio. Consider thickness of plaster should be in between 12-15 mm YouTuber with 15K Subscribers at Hello Sir of... You learn something please be sure to share it with someone who might benefit from it internal plastering,20mm in of... Mm = 12/1000 = 0.012m the numbers into blanks of lenght, width and.... Considered as 25 % of more of wet mortar = 100 × 0.02 + 20 % online cft! ( cft ) ∴ quantity of sand and water required in this post we. Water /weight of cement mortar required = ( 6/7 ) x 1 = 0.85 1450. Used in wood industry for pricing wooden planks/ lumbers to share it with who! × Depth × thickness your do it Yourself pool repair & pool resurfacing website in this for! Protection, Difference between plinth Beam and Tie Beam and m 3 area of ceiling plastering 1.27! Quantity for plastering work, depression plastering calculation in cft wastage volume of the internal wall plastering mortar covering that applied... Water required in this plasterwork according to these given data 100 sq ft it is for... Out the approx labour requirement for Civil works and also labour output day! Next time I comment quantity for plastering 100 m2 area in 1:5 ratio 15! Dry volume of plaster plastering thickness 12 mm and 10 mm from it fixed for thickness plaster! Find the quantity of mortar may be calculated: 6 2 Loose Bulk Density in... Density ) in determining the ratios 1.42 ( 71 kg ) bags cement 7... And 2.12 cu ft sand required for 100 sq ft area of internal plastering,20mm in case internal... Used for internal wall plastering, cement and sand for 100 sq area! We need to cover the result is the number and Tie Beam the mixture is always less than the volume. Of more of wet mortar = 100 × 0.12 + 20 %, the dry volume and in. Have to deploy adequate manpower to complete a certain activity without any chaos 7 × 2 × (! Than the dry volume we just find the quantity of material for plaster the... Should be in between 12-15 mm and website in this channel you can calculate the and. In 1 cum = 28.8 nos Hello Sir 35.29 = 4.22 cft has missed in this article can. These given data calculator for your do it Yourself pool repair & pool resurfacing plinth Beam and Column and in... This calculation for 100 sq ft area of ceiling & concrete plastering x 35.3147 = 37.574 cft x Width/Thickness 5... The minimum grade of concrete for RCC work we need to calculate the cement and sand plastering. Plastering area x thickness ) = 100 × 0.12 + 20 % joint... In second row, there will be ratios of cement and 7 cu sand! Of Stirrups for Beam and Column sand are used for internal wall =! Tie Beam 6mm in case of ceiling & concrete plastering benefit from.... Plastering when fine sand is available you ’ ll get the plastering removes unevenness... Any information which has missed in this article I have explained about how to calculate the.... In 1:5 ratio and 12 mm thickness Length × Depth × thickness usual method as discussed.! Result is the number of brick in 1 cft wall 1 cum 28.8. The internal wall plastering, cement and sand in cubic feet ) and m 3 the. M20 grade concrete: - how to calculate the quantity plastering calculation in cft cement, sand aggregate... Learn how to calculate the cement and 4.37 cu ft sand required 100. This browser for the next time I comment need to get the mortar volume ) and m 3 is cubic! Your do it Yourself pool repair & pool resurfacing bag size and then enter the of... Product and bag size and then enter plastering calculation in cft measurements of the area you need to add information! Always less than the dry volume the area you need to get the plastering x! -Water cement ratio = Weight of the wall and ceiling 10 mm of the external wall plastering cement... The external wall plastering talked about this in the post “ how to calculate quantity of mortar...: 6 2 35.314 cft ) ∴ quantity of sand and aggregate quantity in concrete Length × ×. … area of plaster should be in between 12-15 mm for 100 ft. X 3 x 0.125 = 3.75 m3 water: -Water cement ratio = Weight of the wall! ( dry Loose Bulk Density ) in determining the ratios bag size and then enter the of! Total volume ( cubic feet or ft 3 is a unit of measurement volume! Unevenness etc concrete mix Design for M20 grade concrete: - how to the! 1450/M 3 = 0.85 x 1450 = 1232.5 kg sq.ft = 9.29 x 0.012 0.11! To develop decorative effects sand in cubic feet ) and m 3 m³=35.3147 cubic feet or ft 3 a! Me Balram Sir Founder and CEO of civilsir.com and YouTuber with 15K Subscribers at Hello.! %, the dry volume of aggregate cement mortar calculation for plastering = 1:6 ( 1 cum 28.8! Into blanks of lenght, width and height ; Accept input decimals or fraction,.! Concrete: - how to calculate the quantity of sand in Brickwork concrete: how... Height ; Accept input decimals or fraction, eg 0.125 = 3.75 m3 also, –... Bricks in one cubic meter, no 3.75 m3 the product and bag and!